Windows
Application CTSgo
CTS-K6
1079.2001.01
52
E-3
7.3.11 First Disconnect
Using this command you can determine the procedure for the first call clear-down. Select by a click on
the respective box whether a call release is expected from the mobile or whether the call should be
cleared down by the CTS.
Note:
This command can only be selected if the first connection is activated for the test.
7.3.12 Second Connect
This command permits to select the procedure for the second call clear-down. Select by a click on the
respective box whether the CTSgo program expects a call from the mobile or whether the call should
be set up by the CTS.
Note:
This command can only be selected if the second connection is activated for the test.
7.3.13 Test Set 7
You can determine the measurements to be performed in the selected TCH channel. For details refer
to the description under Test set 1.
Note:
This command can only be selected if test set 7 is activated for the test.
7.3.14 Test Set 8
You can determine the measurements to be performed in the selected TCH channel. For details refer
to the description under Test set 1.
Note:
This command can only be selected if test set 8 is activated for the test.
Fig.: Configure Disconnect dialog window
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...