CTS55
Putting into Operation
1094.0006.55 2.5
E-11
2.2.3 Ensuring Electromagnetic Compliance (EMC)
In order to avoid electromagnetic interference, the instrument may only be operated with all covers in
place as they form part of the shielding for the instrument. Only appropriate shielded signal and control
cables (e.g. RF connecting cables) should be used.
2.2.4
Switching on the Instrument
The CTS is switched on by means of the power switch at the rear.
2.2.5
Options List
After the instrument is switched on a start up screen is displayed while the instruments loads stored
parameters and checks which options are installed. After a short time the options screen is displayed
(see below). It is advisable to check the options after powering up the instrument for the first time to
ensure that the purchased options are installed.
Available Options Menu
If you want to use additional available options, please contact your local Rohde & Schwarz sales
representative.
2.2.6
OCXO Reference Oscillator (Option CTS-B1)
If your instrument is equipped with this option, be aware that an OCXO needs approximately 15
minutes to warm up after switching on the instrument to achieve full precision.
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...