8.3 Summary of Results in the Measurement Report
A summary of test results is given on the last page of each measurement report together with the
number of passed or failed tests. The total measurement time including the waiting times for operator
actions is also specified. Any loss of synchronization is also indicated here together with the name of
the measurement in which the loss occurred.
8.4 Appendix to Measurement Report
The graphics display of the power ramp and the phase curve within the burst are appended to the
measurement report.
The curve is shown in blue, the tolerance mask is recorded in red.
Notes:
The tolerance mask is defined at various points A to H. In the case of GSM900, different criteria are
valid in point A for the rising and falling edge. The points depend on network and power control level.
Some points are assigned both relative and absolute values. The relative values are relative to the
average power in the useful part of the ramp. In GSM, the criterion that can be met more easily is
always valid.
Fig.: Summary of measurement report
Fig.: Appendix to measurement report: power ramp
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...