CTS55 Module
Test
1094.0006.55 7.7
E-5
7.4.4
Other Measurements
Using the "Select" softkey followed by "Start" enters a new menu. These new menus are for the "Power
Ramp" measurement, the "Phase Frequency" measurement and control of the "RF Signal Generator".
The two measurements are described below. For details of the "RF Signal Generator" menu refer to
section 7.6.
7.4.4.1 Power Ramp
Power Ramp Menu
The Power Ramp measurement is similar to that in Manual Test, as described in section 9.7.6. The
template configuration is tied to the Manual Test values.
Exp. Power
The power that you expect to be received by the CTS. This value aids the system’s search for the
signal.
Freq
This defines the receive frequency to use.
While the CTS is searching for the mobile’s signal a small symbol (AR, standing for Auto Ranging) will
appear at the top of the menu. This symbol will disappear when the signal has been found and
measurements are being made.
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...