
Jabiru J450 Constructors Manual
Testing>Forms
Tuesday, April 6, 2010
342 of 343
Trim test
AFT [50-65 KIAS]
FWD [90-140 KIAS]
Cruise power, clean
AFT [60-70 KIAS]
FWD [end of white arc]
Idle, full flap
Glide
at 62 KIAS
V
NE
2700-2900 RPM
Full power, Straight & Level
Timed climb
at 80 KIAS
OAT
P. ALT
1013.2 hPa
EOP
EOT
CHT
EGT
IAS at full power
RPM at full power
Finish P. ALT
sec
Time to climb 1000 ft
EOP
EOT
CHT
EGT
fpm
Rate of climb (indicated)
Controllability
Glide engine RPM
Control rigging
[1000-1200rpm]
Vibration
Controllability
Buffeting
General
Lateral & Directional
Control Rigging
Lateral & Directional
Stability and Control
Lateral & Directional
Rigging and Trim
Longitudinal Static
Stability
Sequence #3 – Performance & handling
page 2 of 3
Control rigging
OAT
Start P. ALT
1013.2 hPa
Trim test
AFT [50-65 KIAS]
FWD [90-140 KIAS]
Cruise power, clean
AFT [50-65 KIAS]
FWD [90-140 KIAS]
AFT [50-65 KIAS]
FWD [90-140 KIAS]
Cruise power, clean
AFT [60-70 KIAS]
FWD [end of white arc]
Idle, full flap
AFT [60-70 KIAS]
FWD [end of white arc]
AFT [60-70 KIAS]
FWD [end of white arc]
Idle, full flap
Glide
at 62 KIAS
V
NE
2700-2900 RPM
Full power, Straight & Level
Timed climb
at 80 KIAS
OAT
P. ALT
1013.2 hPa
EOP
EOT
CHT
EGT
IAS at full power
RPM at full power
Finish P. ALT
sec
Time to climb 1000 ft
EOP
EOT
CHT
EGT
fpm
Rate of climb (indicated)
Controllability
Glide engine RPM
Control rigging
[1000-1200rpm]
Vibration
Controllability
Buffeting
General
Lateral & Directional
Control Rigging
Lateral & Directional
Stability and Control
Lateral & Directional
Rigging and Trim
Longitudinal Static
Stability
Sequence #3 – Performance & handling
page 2 of 3
Control rigging
OAT
Start P. ALT
1013.2 hPa