
Jabiru J450 Constructors Manual
Testing>Final inspection checklist
Tuesday, April 6, 2010
323 of 343
Ventral Fin:
1
Retained nuts in fuselage secure
2
Elevator horn not hitting cut-out in ventral fin at full up deflection
3
Inspection holes drilled
4
Drain holes drilled out
5
Ventral fin secure onto fuselage
Rudder:
1
Centre 5mm offset to right when pedals level
2
Deflection
a)
Left
_________mm from the offset centre mark
b)
Right _________mm from the offset centre mark
3
2mm clearance to the stops on fuselage at full deflection
4
Hinge pin and pin retainers secure
5
Rod end secure
6
Safety in rod end within limits
7
Jam nut on rod end secure
8
Cable anchor secure and correct position in clamp
9
Rod end free at full deflections
Static Vent:
1
Tip secure
2
Holes clear
3
Decal in place
Note that leak testing of the static system has been performed as part of the instrument
checklist.
I hereby certify that I have completed this Final Inspection Checklist:
Owner / Builder / Engineer
(strike out any that do not apply)
Date