
Jabiru J450 Constructors Manual
Testing>Final inspection checklist
Tuesday, April 6, 2010
309 of 343
Testing>Final inspection checklist
This is the checklist that we use in the factory: it covers every part of the aircraft and it
must
be completed before your first flight.
Time to complete properly: at least one full day, probably more. Do
not
rush these checks!
Aircraft Registration:
Jabiru Model:
Firewall forward components
Propeller: Jabiru / Sensenich
Propeller Size:
Propeller Serial No:
Propeller Bolts
1
Check torque (Jabiru prop 7 ft/lbs, Senenich prop 12ft/lbs)
2
Check tip tracking is accurate to < 2mm, adjust if required
3
TorqueSeal the propeller nuts
4
Visually check propeller for serviceability
Spinner
1
Spinner screws secure
2
Check that the spinner and spinner backing plate has been indexed
correctly and marked on the spinner and spinner flange
3
Visually check spinner tracking with the engine running
Engine
1
Engine Serial Number: ___________________
2
Engine mount bolts secure:
a)
firewall
b)
engine
3
Thrust washers in place and correct
4
Fuel hose secure:
a)
bulkhead to fuel pump
b)
fuel pump to carburettor
c)
fuel lines all clamped and tied
d)
fire sleeve covering clamps and lock wired in place
5
Breather hose from fuel pump: drain line routed correctly
6
Drip tray under fuel pump: drain line routed correctly