
Jabiru J450 Constructors Manual
Testing>Final inspection checklist
Tuesday, April 6, 2010
311 of 343
Choke Cable
1
Lock nuts secure both ends of cable
2
Cable end free in carburettor link
3
Split pin secure
4
Cable alignment correct with outer
5
Operational
Carburettor Heat Cable
1
Lock nuts secure both ends
2
Cable end free in carburettor link
3
Split pin secure
4
Cable alignment correct with outer
5
Operational
Cabin Heat Cable
1
Lock nuts secure both ends
2
Butterfly sealing in ON and OFF positions
3
Over-centre spring fitted properly and working
4
SCAT hoses routing – nothing rubbing, etc
Scat Hoses
1
Hot air mixer box to carburettor
a)
hose clamps secure
b)
hose not bunched up under carburettor
c)
cobra head fitted and aligned properly
d)
smooth routing
2
NACA duct in cowl to hot air mixer box cold air inlet
a)
hose clamps secure
b)
smooth routing and secure
3
Heat shroud on muffler to hot air mixer box hot air inlet
a)
hose clamps secure
b)
smooth routing