PHYSICAL INSTALLATION
Conduit Box Installation
27
4. Install the conduit box to the drive using the following screws and nuts tightened to a torque of:
M6 Screws 1 - 6: 55-65 kg-cm / 47.7-56.4 Ib-in / 5.4-6.4 Nm
M8 Screws 7 - 9 and Nuts 14 - 17: 100-110 kg-cm / 86.7-95.4 Ib-in / 9.8-10.8 Nm
M10 Nuts 10 - 13: 250-300 kg-cm / 216.9-260.3 Ib-in / 24.5-29.4 Nm
5. Replace the covers and screws removed in Step 1 to the
original locations. Tighten to a torque of 35-45 kg-cm /
30.3-39 Ib-in. / 3.4-4.4 Nm.
13
1
8
6
10
2
9
11
3
5
12
7
4
17
15
16
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
12
2
3
7
5
Summary of Contents for CERUS X-DRIVE CXD-003A-4V
Page 2: ......
Page 3: ...CERUS X DRIVE INSTALLATION AND OPERATION MANUAL Firmware Version 1 2 Franklin Electric Co Inc ...
Page 96: ...OPERATION Protection Features 96 ...
Page 112: ...ADVANCED APPLICATION OPTIONS Multi Drive Configurations 112 ...
Page 124: ...COMMUNICATIONS BACnet Communication 124 ...
Page 128: ...ACCESSORIES Optional Extension Cards 128 Frame D Frame E Frame F ...
Page 129: ...ACCESSORIES Optional Extension Cards 129 Frame G Frame H ...
Page 132: ...ACCESSORIES Optional Extension Cards 132 ...
Page 234: ...PARAMETER REFERENCE TABLES Parameter Descriptions Motor Menu 234 ...
Page 250: ...GLOSSARY 250 ...