UNPACKING AND INSPECTION
Unpacking
16
5. Some crates are secured with clips. Remove
clips with a suitable prying tool.
6. Remove the crate cover, foam packing inserts,
owner’s manual, and any other items inside
the crate.
7. Remove fasteners securing the drive to the
pallet.
8. Inspect the VFD for damage.
9. Allow the drive to remain on the pallet until
you are ready to install it in the permanent
location. Refer to
.
Lifting
When removing large VFDs from the pallet, use suit
-
able lifting equipment connected to the lifting holes at
the top outer edges of the unit.
Use a spreader bar the same width as the drive so the
lifting cables are straight up and down.
Summary of Contents for CERUS X-DRIVE CXD-003A-4V
Page 2: ......
Page 3: ...CERUS X DRIVE INSTALLATION AND OPERATION MANUAL Firmware Version 1 2 Franklin Electric Co Inc ...
Page 96: ...OPERATION Protection Features 96 ...
Page 112: ...ADVANCED APPLICATION OPTIONS Multi Drive Configurations 112 ...
Page 124: ...COMMUNICATIONS BACnet Communication 124 ...
Page 128: ...ACCESSORIES Optional Extension Cards 128 Frame D Frame E Frame F ...
Page 129: ...ACCESSORIES Optional Extension Cards 129 Frame G Frame H ...
Page 132: ...ACCESSORIES Optional Extension Cards 132 ...
Page 234: ...PARAMETER REFERENCE TABLES Parameter Descriptions Motor Menu 234 ...
Page 250: ...GLOSSARY 250 ...