i
DIVISION 4 - MAINTENANCE
TABLE OF CONTENTS
SECTION 1
SCHEDULED MAINTENANCE .........................................................................................................1
1.1
Aquastorm 200™ Maintenance Checklists .................................................................................................1
Daily Maintenance ............................................................................................................................ 2
Monthly Maintenance ........................................................................................................................3
Annual Maintenance ..........................................................................................................................4
1.2
Post Shut-Down Check ........................................................................................................................... 6
Preliminary ..................................................................................................................................... 6
Tempered Glass Windows and Splash Shields ......................................................................................6
Conveyor Belt .................................................................................................................................. 7
Spray Nozzles .................................................................................................................................. 7
Wash, Rinse and Optional Chemical Isolation Tanks ............................................................................ 8
Photocell ......................................................................................................................................... 9
1.3
Daily Maintenance Procedure .................................................................................................................10
Wash, Rinse, and Chemical Isolation Tanks ....................................................................................... 10
Prewash Section ............................................................................................................................ 14
Conveyor Belt ................................................................................................................................ 15
Descaling....................................................................................................................................... 16
1.4
Monthly Maintenance Procedure .............................................................................................................16
Descaling....................................................................................................................................... 16
Radiant Panel Heaters .....................................................................................................................21
Blower Belt Tension Inspection ........................................................................................................22
Turbine Blower Air Filter .................................................................................................................26
Pump Inlet Recirculation Filters .......................................................................................................28
Liquid Level Float Switches .............................................................................................................29
Immersion Heater Inspection ........................................................................................................... 30
Rear Plumbing Inspection ...............................................................................................................31
Ventilation .................................................................................................................................... 31
Optional Detergent Injection System ................................................................................................ 31
1.5
Annual Maintenance Procedure ..............................................................................................................32
Electrical Wiring............................................................................................................................ 32
Liquid Level Float Switches .............................................................................................................32
Turbine Blower Motor Lubrication .................................................................................................... 32
Conveyor Drive .............................................................................................................................. 33
Pressure Gauge Lines ......................................................................................................................33
SECTION 2
CALIBRATION.............................................................................................................................. 34
2.1
Dart Conveyor Motor Speed Control Calibration ...................................................................................... 34
2.2
Myron L 753 Type Resistivity Monitor .................................................................................................... 35
Summary of Contents for Aquastrom 200
Page 48: ......
Page 142: ...Aquastorm 200 Maintenance 4 49 ...