Aquastorm 200
Maintenance 4-45
1
2
Install the wire belt splicing links as depicted
(in a "U" shape) in photograph 1, ensuring
that the loop ends of the splice links are in the
same direction as the wire belt loops.
Once both splicing links are in place,
positioned in the "U" shape, pan tie the
oposing ends of the wire belt together as
depicted in photograph 2, to keep them from
slipping apart while completing the wire belt
splice.
DETAIL "A"
DETAIL "A"
Splice Intersection Point
Splice Intersection Point
DETAIL "B"
DETAIL "B"
3.4
WIRE BELT CONNECTING LINK REPLACEMENT PROCEDURE
Summary of Contents for Aquastrom 200
Page 48: ......
Page 142: ...Aquastorm 200 Maintenance 4 49 ...