![Terumo BCT Spectra Optia Apheresis System Скачать руководство пользователя страница 210](http://html1.mh-extra.com/html/terumo-bct/spectra-optia-apheresis-system/spectra-optia-apheresis-system_operators-manual_1090434210.webp)
Bone Marrow Processing (BMP) Procedures
196
Spectra Optia Apheresis System Operator’s Manual
9
Remove the administration line and the BM bag. Discard the line and the bag according to your facility’s
standard operating procedure.
Figure 14-1:
Correct location to seal the administration line on the BMP Accessory Set
Selecting the Procedure
Follow the instructions on page 64 to select the procedure.
Preparing the Tubing Set for Plasma Collection When Using an IDL Set With Catalog
Number 10300
If you configured the system to collect plasma and you are using an IDL Set with the catalog number 10300, a
screen appears before you load the tubing set instructing you to prepare the tubing set for plasma collection.
Unpack the tubing set, and then either spike the plasma bag on the replace line of the tubing set or use a sterile
tubing welder to connect the plasma bag to the replace line. Using a sterile tubing welder to connect the plasma bag
helps to maintain a functionally closed system.
Spiking the plasma bag on the replace line
Seal or clamp the plasma bag line, and then follow the instructions on the screen.
Using a sterile tubing welder to connect the plasma bag to the replace line
Connect the plasma bag line to the replace line between the frangible connector and the cassette of the tubing set.
Follow the manufacturer’s instructions for using the sterile tubing welder.
Loading and Priming the Tubing Set
Verify that the tubing set and the saline solution you are using have not expired by checking the expiration date
printed on the packaging. Do not use an item if the current date is past the expiration date. Then follow the
instructions starting on page 65 to load and prime the tubing set.
The AC line is not used during a BMP procedure. After you load the tubing set, follow the instructions on the
screen to seal the AC line. This AC line should be sealed to prevent air from entering the set.
SpectraOptiaOpsManual.book Page 196 Thursday, May 17, 2018 11:24 AM