Preparing to Perform a Procedure
66
Spectra Optia Apheresis System Operator’s Manual
Unpacking the Lines and the Bags
Put the tubing set package on top of the centrifuge cover with the package label upright and facing you, and
remove the cover from the package. Follow the instructions below according to the type of tubing set you are using.
Exchange Set
1
Take the line holder out of the package. The line holder holds the replace line (white clamps), the AC line
(orange), the saline line (green), and the extra remove line (yellow clamp). The remove bag with the attached
remove line is located inside the line holder.
2
Take out the remove bag and the extra remove line. Put the remove bag with attached lines on the right side
of the centrifuge cover.
3
Take out the replace line and put the line over the right side of the front panel.
4
Take out the AC line (orange) and the saline line (green) and hang the lines over the left side of the front
panel. Set the empty line holder aside.
5
Take the vent bag out of the package and hang the bag on the left side of the IV pole.
6
Take out the coiled inlet line (red clamps) and remove the paper tape from the coil. Hang the inlet
connection on the left end of the IV pole. Repeat this step with the return line (blue clamps).
7
Hang the remove bag on the IV pole.
Collection Set
1
Take the product bags and the vent bag out of the package and hang the bags from left to right on the IV pole
in the following order: vent bag, plasma bag, collection bag.
2
Take out the coiled inlet line (red clamps) and remove the paper tape from the coil. Hang the inlet
connection on the left end of the IV pole. Repeat this step with the return line (blue clamps).
3
Take out the AC line (orange) and the saline line (green) and hang the lines over the left side of the front
panel.
IDL Set
1
Take the product bags and the vent bag out of the package and hang the bags from left to right on the IV pole
in the following order: vent bag, plasma bag, collection bag.
2
Take out the replace line and put the line over the right side of the front panel between the two sides of the
IV pole.
3
Take out the coiled inlet line (red clamps) and remove the paper tape from the coil. Hang the inlet
connection on the left end of the IV pole. Repeat this step with the return line (blue clamps).
4
Take out the AC line (orange) and the saline line (green) and hang the lines over the left side of the front
panel.
SpectraOptiaOpsManual.book Page 66 Thursday, May 17, 2018 11:24 AM