YH4
GRAND
VITARA
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
6E1-39
“VSS, C51-2-25”
VEHICLE SPEED SENSOR (VSS)
On-Vehicle Inspection
1) Hoist vehicle.
2) Release parking brake lever, set transmission in neutral and
transfer in “2H”.
3) Remove ECM / PCM cover.
4) Connector voltmeter between VSS terminal of ECM / PCM con-
nector and body ground.
5) Turn ignition switch ON and turn rear right tire slowly with rear
left tire locked.
Voltmeter should indicate deflection between 0 – 1 V and 8 – 14 V
a few times while tire is turned one revolution.
If check result is not satisfactory, proceed to Step 2 of “DTC
P0500 (No.24) Diag. Flow Table” in “Engine Diagnosis” section.
CAMSHAFT POSITION SENSOR (CMP SENSOR)
On-Vehicle Inspection
Check CMP sensor and its circuits referring to flow table of diagnos-
tic trouble code P0340 in “Engine Diagnosis” section.
If malfunction is found, replace.
Removal and Installation (J20 Engine)
Refer to “CMP Sensor Removal / Installation” in Section 6F2.
Removal (G16 Engine)
1) Disconnect negative cable from battery.
2) Disconnect connector from CMP sensor.
3) Remove CMP sensor from sensor case.
Installation (G16 Engine)
1) Check that O-ring is free from damage.
2) Check that CMP sensor and signal rotor tooth are free from any
metal particles and damage.
3) Install CMP sensor to sensor case.
Tightening Torque
(a): 9 N
.
m (0.9 kg-m, 6.5 lb-ft)
4) Connect connector to it securely.
5) Connect negative cable to battery.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...