YH4
GRAND
VITARA
6A2-38
ENGINE MECHANICAL (H25 ENGINE)
(d)
1. Silver plate
2. Match mark on intake sprocket
3. RH bank cylinder head
1. Gold or Yellow plate
2. Match mark on crankshaft timing sprocket
3. Crankshaft
1. Plunger
2. Latch
3. Stopper
1. Timing chain tensioner adjuster No.1
2. Timing chain tensioner
3. Stopper
9) Install idler sprocket No.2 by aligning match marks on LH silver
plate of 1st timing chain.
10) Install crankshaft sprocket by aligning match marks on gold or
yellow plate of 1st timing chain and crankshaft timing sprocket.
To install it, fit a spanner to hexagonal part at the center of RH
bank intake camshaft to turn a little.
CAUTION:
Do not turn camshaft more than necessary.
If turned excessively, valve and piston may get dam-
aged.
11) Apply oil to bearing of idler sprocket No.1.
12) Install idler sprocket No.1.
Tightening Torque
(c): 45 N
.
m (4.5 kg-m, 32.5 lb-ft)
13) With latch of tensioner adjuster No.1 returned and plunger
pushed back into body, insert stopper into latch and body.
After inserting it, check to make sure that plunger will not come
out.
14) Install timing chain tensioner adjuster No.1.
Tightening Torque
(d): 11 N
.
m (1.1 kg-m, 7.5 lb-ft)
15) Pull out stopper from adjuster No.1.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...