YH4
GRAND
VITARA
6G-16
CRANKING SYSTEM
1. Terminal ‘S’
2. Terminal ‘M’
3. Lead wire (switch to motor)
PERFORMANCE TEST
CAUTION:
Each test must be performed within 3 – 5 seconds to avoid
coil from burning.
1) Pull-In Test
Connect battery to magnetic switch as shown.
Check that plunger and pinion move outward.
If plunger and pinion don’t move, replace magnetic switch.
NOTE:
Before testing, disconnect lead wire from terminal M.
2) Hold-In Test
While connected as above with plunger out, disconnect nega-
tive lead from terminal ‘M’.
Check that plunger and pinion remain out.
If plunger and pinion return inward, replace magnetic switch.
3) Plunger and Pinion Return Test
Disconnect negative lead from switch body.
Check that plunger and pinion return inward.
If plunger and pinion don’t return, disassemble and inspect start-
ing motor.
4) No-Load Performance Test
a) Connect battery and ammeter to starter as shown.
b) Check that starter rotates smoothly and steadily with pinion
moving out. Check that ammeter indicates specified current.
Specified current:
90A MAX. at 11V
NOTE:
Use wires as thick as possible and tighten each terminal ful-
ly.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...