YH4
GRAND
VITARA
6E1-50
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
1. Tank pressure
control valve
2. Orange side
3. Black side
4. To canister
5. From fuel tank
1. PCV valve
1. PCV valve
1
Tank Pressure Control Valve Inspection
1) Remove tank pressure control valve installed around EVAP can-
ister.
2) Air should pass through valve smoothly from fuel tank side
(black side of tank pressure control valve) to orange side when
blown hard.
3) From orange side, even when blown softly, air should come out
of black side.
4) If air doesn’t pass through valve in step 2) or hard blow is re-
quired in step 3), replace tank pressure control valve.
WARNING:
DO NOT SUCK air through tank pressure control valve.
Fuel vapor inside the valve is harmful.
5) Install tank pressure control valve.
NOTE:
When connecting tank pressure control valve between
hoses, refer to figure at the left for installing direction.
PCV SYSTEM
NOTE:
Be sure to check that there is no obstruction in PCV valve or
its hoses before checking engine idle speed / IAC duty for ob-
structed PCV valve or hose hampers its accurate checking.
PCV HOSE
Check hoses for connection, leakage, clog, and deterioration.
Replace as necessary.
PCV VALVE
1) Disconnect PCV valve from cylinder head cover and plug head
cover hole.
2) Run engine at idle.
3) Place your finger over end of PCV valve to check for vacuum.
If there is no vacuum, check for clogged valve. Replace as nec-
essary.
4) After checking vacuum, stop engine and remove PCV valve.
Shake valve and listen for the rattle of check needle inside the
valve. If valve does not rattle, replace valve.
5) After checking, connect PCV valve, PCV hose and clamp se-
curely.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...