YH4
GRAND
VITARA
6E1
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
6E1-1
GENERAL DESCRIPTION
6E1- 3
. . . . . . . . . . . . . .
AIR INTAKE SYSTEM
6E1- 8
. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM
6E1- 9
. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM
6E1-10
. . . . . .
Engine & Emission Control Input /
Output Table
6E1-16
. . . . . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE
6E1-17
. . . . . . . . . . . . . . . .
General
6E1-18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment
6E1-18
. . . . . . . . . .
A / T Throttle Cable Adjustment (4 A / T)
6E1-18
. . .
Idle Speed / Idle Air Control Duty
Inspection
6E1-19
. . . . . . . . . . . . . . . . . . . . . . . . . .
Idle Mixture Inspection / Adjustment
6E1-20
. . . . . .
AIR INTAKE SYSTEM
6E1-21
. . . . . . . . . . . . . . . . . .
Throttle Body
6E1-21
. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve
6E1-23
. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM
6E1-24
. . . . . . . . . . . . . .
Fuel Pressure Inspection
6E1-24
. . . . . . . . . . . . . .
Fuel Pump
6E1-25
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator
6E1-26
. . . . . . . . . . . . . . .
Fuel Injector
6E1-27
. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM
6E1-31
. . . . . .
ECM / PCM
6E1-31
. . . . . . . . . . . . . . . . . . . . . . . . . . .
MAF Sensor
6E1-32
. . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor
6E1-34
. . . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor
6E1-35
. . . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor
6E1-36
. . . . . . . . . . . . . . . . . . . . . . . . .
SECTION 6E1
ENGINE AND EMISSION CONTROL SYSTEM
(SEQUENTIAL MULTIPORT FUEL INJECTION FOR
G16/J20 ENGINES)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
NOTE:
Whether following systems (parts) are used in the particular vehicle or not depends on specifications. Be
sure to bear this in mind when performing service work.
EGR valve
Heated oxygen sensor(s) or CO adjusting resistor
Three way catalytic converter(s)
MAP sensor
Ignition timing adjusting resistor or CKP sensor
Monitor connector
CONTENTS
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...