YH4
GRAND
VITARA
6-1-4
ENGINE (H25 ENGINE)
Crank
shaft
pulley
side
6
4
1. No.1 cylinder
2. No.2 cylinder
3. No.3 cylinder
4. No.4 cylinder
5. No.5 cylinder
6. No.6 cylinder
7. LH (No.1) bank
8. RH (No.2)bank
H25
GENERAL INFORMATION
STATEMENT OF CLEANLINESS AND CARE
An automobile engine is a combination of many machined, honed,
polished and lapped surfaces with tolerances that are measured in
the thousands of an millimeter (ten thousands of inch). Accordingly,
when any internal engine parts are serviced, care and cleanliness
are important. Throughout this section, it should be understood that
proper cleaning and protection of machined surfaces and friction
areas is part of the repair procedure. This is considered standard
shop practice even if not specifically stated.
A liberal coating of engine oil should be applied to friction areas
during assembly to protect and lubricate the surface on initial op-
eration.
Whenever valve train components, pistons, piston rings, con-
necting rods, rod bearings and crankshaft journal bearings are re-
moved for service, they should be retained in order. At the time
of installation, they should be installed in the same locations and
with the same mating surfaces as when removed.
Battery cables should be disconnected before any major work is
performed on the engine. Failure to disconnect cables may result
in damage to wire harness or other electrical parts.
Throughout this manual, the 6 cylinders of the engine are identi-
fied by numbers; No.1, No.2, No.3, No.4, No.5 and No.6 as
counted from crankshaft pulley side to flywheel side.
Figure at the left shows engine with intake manifold removed and
viewed from the top.
LH (No.1) bank consists of No.1, No.3 and No.5 cylinders.
RH (No.2) bank consists of No.2, No.4 and No.6 cylinders.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...