YH4
GRAND
VITARA
6A2-54
ENGINE MECHANICAL (H25 ENGINE)
1. Cylinder head
2. Oil hole
1. Crank timing pulley key
2. Oil jet
1. LH bank intake camshaft
2. LH bank exhaust camshaft
3. LH bank cylinder head
4. Match mark
LH bank
INSTALLATION
1) Before installing valve lash adjuster to cylinder head, fill oil pas-
sage of cylinder head with engine oil according to following pro-
cedure.
Pour engine oil through oil holes and check that oil comes out
from oil holes in sliding part of valve lash adjuster.
Perform this check on both intake and exhaust sides.
2) Valve lash adjuster to cylinder head.
Apply engine oil around valve lash adjuster and then install it to
cylinder head.
3) Check timing mark on crankshaft as shown in figure.
4) Install RH bank camshafts, referring to item “RH (NO.2) BANK
2ND TIMING CHAIN AND CHAIN TENSIONER” in this section
for installation.
5) Install LH bank camshafts.
Apply oil to sliding surface of each camshaft and camshaft jour-
nal then install them by aligning match marks on cylinder head
and LH bank camshafts as shown in figure.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...