YH4
GRAND
VITARA
ENGINE (H25 ENGINE)
6-1-53
Fig. for STEP 2
DTC CONFIRMATION PROCEDURE
NOTE:
Check to make sure that following conditions are satisfied when using this DTC CONFIRMATION PROCE-
DURE.
WARNING:
D
When performing a road test, select a place where there is no traffic or possibility of a traffic accident
and very careful during to avoid occurrence of an accident.
D
Road test, should be carried out with 2 person, a driver and tester, on a level road.
D
Intake air temperature: between – 14
_
C and 70
_
C (6.8
_
F and 158
_
F)
D
Atmospheric pressure: higher than 560 mmHg (Altitude: lower than 2790 m (9150 ft))
(1) With ignition switch OFF, connect scan tool.
(2) Turn ON ignition switch and clear DTC by using scan tool if any.
(3) Start engine and run it for 10 sec.
(4) Check DTC by using scan tool.
DTC TROUBLESHOOTING
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
MAF Sensor Power Supply Voltage check:
(1) With ignition switch OFF, disconnect MAF sensor
coupler (1).
(2) With ignition switch ON, check voltage between
C32-3 (2) and ground.
Is voltage 10 – 14 V?
Go to Step 3.
Faulty “Bl / B” wire.
3
MAF Sensor Output Voltage check:
(1) With ignition switch OFF, connect MAF sensor
coupler.
(2) Remove ECM (PCM) cover.
(3) With ignition switch ON leaving engine OFF, check
voltage between C51-3-23 and C51-3-21 terminal.
Is voltage 0.5 – 1.0 V?
Poor C51-3-23 or /
and C51-3- 21
terminal connection.
If OK, substitute a
known-good ECM
(PCM) and recheck.
Faulty “V / W” wire
and “Gr / Y” wire.
Poor C32 coupler
terminal connection.
If wire and
connection are OK,
substitute a known-
good MAF sensor
and recheck.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...