YH4
GRAND
VITARA
1. Monitor connector
2. Service wire
3. Ground terminal
4. Test switch terminal
1. “V” mark on crankshaft pulley
2. 5
_
BTDC
1
(A)
6F1-6
IGNITION SYSTEM (FOR G16 ENGINE)
IGNITION TIMING CHECK
NOTE:
Before starting engine, place transmission gear shift lever in
“Neutral” (shift selector lever to “P” range for A / T model), and
set parking brake.
1) Start engine and warm it up to normal operating temperature.
2) Make sure that all of electrical loads except ignition are switched
off.
3) Check to be sure that idle speed is within specification.
(Refer to SECTION 6E1.)
4) Fix ignition timing as follows.
[Using SUZUKI scan tool (Tech 1)]
Connect SUZUKI scan tool (Tech 1) to DLC (1) with ignition
switch OFF, restart engine and fix ignition timing by using fixed
spark mode of SUZUKI scan tool (Tech 1).
Special Tool
(A): 09931-76011 (SUZUKI scan tool)
(B): Mass storage cartridge
(C): 16 / 14 pin DLC (OBD-II adapter) cable
[Not using SUZUKI scan tool (Tech 1)] (for vehicle with monitor
connector)
a) Remove monitor connector cap.
b) Ground test switch terminal in monitor connector by using
service wire so that ignition timing is fixed on initial one.
5) Set timing light to high-tension cord for No.1 cylinder.
6) Using timing light, check that timing is within specification.
Initial ignition timing of viewpoint
(test switch terminal grounded): 5
1
_
BTDC
Ignition order: 1-3-4-2
Special Tool
(A): 09930-76420
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...