YH4
GRAND
VITARA
6A2-32
ENGINE MECHANICAL (H25 ENGINE)
1. Crank timing pulley key
2. Oil jet
3. Timing mark of RH bank 1st timing chain sprocket
4. Timing mark of RH bank 1st timing chain
5. Timing mark or LH bank 2nd timing chain intake sprocket
6. Timing mark of LH bank 2nd timing chain
7. Timing mark of LH bank 2nd timing chain exhaust sprocket
8. Timing mark of LH bank 2nd timing chain
9. Timing mark of RH bank 2nd timing chain intake sprocket
10. Timing mark of RH bank 2nd timing chain exhaust sprocket
11) Turn crankshaft two rotations clockwise then align timing mark
on crankshaft and timing mark on cylinder block as shown in
figure.
Check each other timing marks that align them shown in figure.
12) Apply oil to timing chains, tensioner adjusters sprockets, and
guides.
13) Install timing chain cover, oil pan, front differential housing, P / S
system, cooling system, intake manifold with throttle body and
other parts.
14) Refill cooling system, P / S system, front differential and engine
with each oil / fluid.
15) Check wheel alignment, referring to Section 3.
16) Verify that there is no fuel leakage, water leakage and oil leak-
age at each connection.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...