YH4
GRAND
VITARA
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
6-81
TROUBLESHOOTING (DTC P0400)
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
Is there DTC P0403 (EGR circuit malfunction)?
Go to DTC P0403
Diag. Flow Table.
Go to Step 3.
3
Do you have SUZUKI scan tool?
Go to Step 4.
Go to Step 6.
4
EGR Valve Operation Check:
1) With ignition switch OFF, install SUZUKI scan tool.
2) Check EGR system referring to Section 6E1.
Is it in good condition?
Go to Step 5.
Go to Step 6.
5
MAP Sensor Check:
1) Check MAP sensor for performance referring to
Section 6E1.
Is check result satisfactory?
Intermittent trouble
or faulty ECM
(PCM). Check for
intermittent refer-
ring to “Intermittent
and Poor Connec-
tion” in Section 0A.
Repair or replace.
6
EGR Valve Power Supply Circuit Check:
1) With ignition switch OFF, disconnect EGR valve
coupler.
2) With ignition switch ON, check voltage between
C04-2 and ground, C04-5 and ground.
Is each voltage 10 – 14 V?
Go to Step 7.
Faulty “Bl / B” wire.
7
EGR Valve Stepper Motor Coil Circuit Check:
1) With ignition switch OFF, connect EGR valve coupler
and disconnect ECM (PCM) couplers.
2) Check resistance between C51-3-4 and C51-2-13,
C51-2-14, C51-2-15, C51-2-16.
Is each resistance 20 – 24
at 20
_
C, 68
_
F?
Go to Step 8.
Faulty “Lg”, “Lg / W”,
“Lg / R”, “Lg / Y” wire
or EGR valve.
8
MAP Sensor Check:
1) Check MAP sensor for performance referring to
Section 6E1.
Is check result satisfactory?
EGR passage
clogged or EGR
valve malfunction.
If all above are OK,
intermittent trouble
or faulty ECM
(PCM).
Check for intermit-
tent referring to
“Intermittent and
Poor Connection” in
Section 0A.
Repair or replace.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...