YH4
GRAND
VITARA
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
6E1-23
1. Plunger
IDLE AIR CONTROL VALVE (IAC VALVE)
Inspection
1) Disconnect connector from IAC valve.
2) Check each coil of IAC valve for resistance.
Terminals
Resistance
Between “1” and “2”
“3” and “2”
“4” and “5”
“6” and “5”
35 – 43
If resistances is out of specification, replace.
3) Remove air cleaner outlet hose and remove IAC valve from
throttle body.
4) Connect connector to IAC valve.
5) Check that plunger of IAC valve moves once and then stops as
soon as ignition switch is turned OFF after cranking engine for
2 seconds.
NOTE:
This check should be performed by two people, one person
operates ignition switch while the other checks plunger op-
eration.
If plunger of IAC valve does not operate at all, check wire har-
nesses for open and short. If wire harnesses are in good condi-
tion, replace IAC valve and recheck.
Removal
1) Disconnect negative cable from battery.
2) Disconnect connector from IAC valve.
3) Remove IAC valve from throttle body.
Installation
1) Install new O-ring to throttle body.
2) Install IAC valve to throttle body.
Tighten IAC valve screws to specified torque.
Tightening Torque
(a): 3.5 N
.
m (0.35 kg-m, 2.5 lb-ft)
3) Connect IAC valve connector securely.
4) Connect negative cable to battery.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...