YH4
GRAND
VITARA
ENGINE MECHANICAL (H25 ENGINE)
6A2-87
2, (a)
3, (b)
4, (b)
1. Gaging plastic
1. Lower crankcase
2. Bolt (10 mm thread diameter)
3. Bolt (8 mm thread diameter)
4. Long bolt (8 mm thread diameter)
1. Gaging plastic
2. Scale
Inspect
Check bearings for pitting, scratches, wear or damage.
If any malcondition is found, replace both upper and lower halves.
Never replace either half without replacing the other half.
Main bearing clearance
Check clearance by using gaging plastic according to following pro-
cedure.
1) Remove crankcase.
2) Clean bearings and main journals.
3) Place a piece of gaging plastic to full width of bearing (parallel
to crankshaft) on journal, avoiding oil hole.
4) Install crankcase to cylinder block.
Tighten crankcase bolts, following sequence in figure. Tighten
crankcase bolts to specified torque.
NOTE:
Tighten 10 mm thread diameter bolts first (following the or-
der shown in figure) then tighten 8 mm thread diameter
bolts.
Tightening Torque
(a): 60 N
.
m (6.0 kg-m, 43.5 lb-ft)
(b): 27 N
.
m (2.7 kg-m, 19.5 lb-ft)
NOTE:
Do not rotate crankshaft while gaging plastic is installed.
5) Remove crankcase and using scale on gaging plastic envelop,
measure gaging plastic width at its widest point. If clearance ex-
ceeds its limit, replace bearing. Always replace both upper and
lower inserts as a unit.
A new standard bearing may produce proper clearance. If not,
it will be necessary to regrind crankshaft journal for use of
0.25 mm undersize bearing.
After selecting new bearing, recheck clearance.
Bearing Clearance
Standard: 0.026 – 0.046 mm (0.0010 – 0.0018 in.)
Limit:
0.060 mm (0.0023 in.)
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...