YH4
GRAND
VITARA
ENGINE MECHANICAL (H25 ENGINE)
6A2-89
1. Paint
3) There are five kinds of standard bearings differing in thickness.
To distinguish them, they are painted in following colors at the
position as indicated in figure.
Each color indicates following thickness at the center of bearing.
Color painted
Bearing thickness
Green
2.493 – 2.497 mm
(0.0982 – 0.0983 in.)
Black
2.496 – 2.500 mm
(0.0983 – 0.0984 in.)
Colorless (no paint)
2.499 – 2.503 mm
(0.0984 – 0.0985 in.)
Yellow
2.502 – 2.506 mm
(0.0985 – 0.0986 in.)
Blue
2.505 – 2.509 mm
(0.0986 – 0.0987 in.)
4) From number stamped on crank webs at its center and alpha-
bets stamped on crankcase lower side, determine new standard
bearing to be installed to journal, by referring to table shown be-
low.
For example, if number stamped on crank webs is “1” and alpha-
bet stamped on crankcase is “B”, install a new standard bearing
painted in “Black” to its journal.
Number stamped on crank web
(Journal diameter)
1
2
3
Alphabet
stamped
A
Green
Black
Colorless
stam ed
on lower
crankcase
B
Black
Colorless
Yellow
crankcase
(Cap bore dia.)
C
Colorless
Yellow
Blue
New standard bearing to be installed.
5) Using gaging plastic, check bearing clearance with newly se-
lected standard bearing.
If clearance still exceeds its limit, use next thicker bearing and
recheck clearance.
6) When replacing crankshaft or cylinder block and crank case due
to any reason, select new standard bearings to be installed by
referring to number stamped on new crankshaft or alphabets
stamped on new crankcase lower side.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...