YH4
GRAND
VITARA
6E2-20
ENGINE AND EMISSION CONTROL SYSTEM (H25 ENGINE)
15) Remove throttle body (3) and intake collector (2) from intake
manifold (1).
15) Disconnect hoses of IAC valve and PCV from throttle body.
16) Remove throttle body from intake collector.
NOTE:
MAF sensor (4), TP sensor (5), or other components con-
taining rubber must not be placed in a solvent or cleaner
bath. A chemical reaction will cause these parts to swell,
harden or get distorted.
Don’t put drills or wires into passages for cleaning. It
causes damages in passages.
Installation
1) Clean mating surfaces and install throttle body gasket to intake
collector (1) with new gasket (2).
2) Install throttle body to intake collector and tighten bolts.
3) Connect IAC valve hose and PCV hose.
4) Install throttle body and intake collector to intake manifold with
new intake collector gaskets.
5) Install EGR pipe with new gaskets.
6) Connect PCV hose, breather hose and EVAP canister purge
valve hose.
7) Connect connectors of EVAP canister purge valve and EGR
valve.
Fix wire harness with clamps.
8) Install clamp bracket to intake collector.
9) Connect ground terminal to intake manifold.
10) Connect connectors of TP sensor, MAF sensor and IAC valve.
11) Connect connector of injector wire.
12) Install surge tank pipe to intake manifold with new gaskets and
intake air pipe to throttle body.
13) Install surge tank cover.
14) Connect engine coolant hoses to throttle body.
15) Connect accelerator cable and A / T throttle cable (A / T).
16) Install strut tower bar (1) and tighten bolts.
17) Refill cooling system.
18) Connect negative cable at battery.
19) Adjust accelerator cable and A / T throttle cable, refer to “AC-
CELERATOR CABLE ADJUSTMENT” and “A / T THROTTLE
CABLE ADJUSTMENT” in this section.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...