YH4
GRAND
VITARA
6-44
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
TABLE A-5
INSPECTION
STEP
ACTION
YES
NO
1
Main Relay Operating Sound Check:
Is operating sound of main relay heard at ignition
switch ON?
Go to Step 5.
Go to Step 2.
2
Fuse Check:
Is main “FI” fuse in good condition?
Go to Step 3.
Check for short in
circuits connected to
this fuse.
3
Main Relay Check:
1) Turn OFF ignition switch and remove main relay.
2) Check for proper connection to main relay at
terminal 3 and 4.
3) If OK, check main relay for resistance and
operation referring to “Main Relay Inspection”
in Section 6E1.
Is check result satisfactory?
Go to Step 4.
Replace main relay.
4
ECM (PCM) Power Circuit Check:
1) Turn OFF ignition switch, disconnect connectors
from ECM (PCM) and install main relay.
2) Check for proper connection to ECM (PCM) at
terminals C51-3-20, E61-9, C51-3-15 and
C51-3-4.
3) If OK, then measure voltage between terminal
C51-3-20 and ground, E61-9 and ground with
ignition switch ON.
Is each voltage 10 – 14 V?
Go to Step 5.
“B / W”, “Bl” or “B / R”
circuit open.
5
ECM Power Circuit Check:
1) Using service wire, ground terminal E61-9 and
measure voltage between terminal C51-3-15 and
ground at ignition switch ON.
Is it 10 – 14 V?
Check ground circuits
“B / G” and “B / Bl” for
open.
If OK, then substitute a
known-good ECM
(PCM) and recheck.
Go to Step 6.
6
Is operating sound of main relay heard in Step 1?
Go to Step 7.
“B / R” or “Bl / B” wire
open.
7
Main Relay Check:
1) Check main relay according to procedure in
Step 3.
Is main relay in good condition?
“B / R” or “Bl / B” wire
open.
Replace main relay.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...