YH4
GRAND
VITARA
1. Valve head thickness
2. 45
_
(1)
(2)
ENGINE MECHANICAL (G16 ENGINE)
6A1-45
INSPECTION
Valve Guides
Using a micrometer and bore gauge, take diameter readings on
valve stems and guides to check stem-to-guide clearance.
Be sure to take reading at more than one place along the length of
each stem and guide.
If clearance exceeds limit, replace valve and valve guide.
Item
Standard
Limit
Valve stem
In
5.465 – 5.480 mm
(0.2152 – 0.2157 in.)
–
diameter
Ex
5.440 – 5.455 mm
(0.2142 – 0.2148 in.)
–
Valve guide
In
5.500 – 5.512 mm
–
g
I.D.
Ex
(0.2166 – 0.2170 in.)
–
Stem-to-guide
In
0.020 – 0.047 mm
(0.0008 – 0.0018 in.)
0.07 mm
(0.0027 in.)
g
clearance
Ex
0.045 – 0.072 mm
(0.0018 – 0.0028 in.)
0.09 mm
(0.0035 in.)
If bore gauge is not available, check end deflection of valve stem
with a dial gauge instead.
Move stem end in directions (1) and (2) to measure end deflection.
If deflection exceeds its limit, replace valve stem and valve guide.
Valve stem end deflection limit
In
0.14 mm (0.005 in.)
Valve stem end deflection limit
Ex
0.18 mm (0.007 in.)
Valves
D
Remove all carbon from valves.
D
Inspect each valve for wear, burn or distortion at its face and stem
and, as necessary, replace it.
D
Measure thickness of valve head. If measured thickness exceeds
limit, replace valve.
Valve head thickness
Standard
Limit
In
0.8 – 1.2 mm
0.6 mm (0.024 in.)
Ex
(0.03 – 0.047 in.)
0.7 mm (0.027 in.)
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...