YH4
GRAND
VITARA
1
3
(A)
(A)
1
2
3
1. CMP sensor
2. Bolt
1. Viewpoint
2. Timing mark on
chain cover
3. Timing mark on
crankshaft pulley
J20 Engine
H25 Engine
J20 Engine
H25 Engine
IGNITION SYSTEM (FOR J20 / H25 ENGINES)
6F2-7
5) Set timing light to ignition harness for No.1 cylinder.
6) Using timing light, check that timing observed from viewpoint
is within specification.
Initial ignition timing of viewpoint
(when it is fixed by Tech 1 or service wire): 5
1
_
BTDC
Ignition order: 1-3-4-2 (J20 engine)
: 1-6-5-4-3-2 (H25 engine)
Special Tool
(A): 09930-76420
7) If ignition timing is out of specification, loosen flange bolt(s), ad-
just timing by turning CMP sensor while engine is running, and
then tighten bolt(s).
Tightening Torque
(a): 15 N
.
m (1.5 kg-m, 11.0 lb-ft)
8) After tightening bolt(s), recheck that ignition timing is within
specification.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...