YH4
GRAND
VITARA
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
6E1-29
When using
SUZUKI scan tool:
When not using
SUZUKI scan tool:
1. Fuel pump
relay
connector
2. Service wire
3. Junction
(Fuse) box
1. Injector
2. Battery
3. Keep as far
apart
as possible
1. Injector
2. Vinyl tube
3. Less than one fuel
drop / min.
4. Graduated
cylinder
[A]: LH steering vehicle (canvas top)
[B]: RH steering vehicle (canvas top)
[C]: LH steering vehicle (hard top)
[D]: RH steering vehicle (hard top)
4) Install suitable vinyl tube onto injector nozzle to prevent fuel from
splashing out when injecting.
5) Put graduated cylinder under injector as shown.
6) Operate fuel pump and apply fuel pressure to injector as follows:
When SUZUKI scan tool can be used:
(1) Connect SUZUKI scan tool to DLC with ignition switch OFF.
(2) Turn ignition switch ON, clear DTC and select “MISC TEST”
mode on SUZUKI scan tool.
(3) Turn fuel pump ON by using SUZUKI scan tool.
When not using SUZUKI scan tool:
(1) Remove fuel pump relay from connector.
(2) Connect two terminals of relay connector using service wire
as shown in figure.
CAUTION:
Check to make sure that connection is made between
correct terminals. Wrong connection can cause damage
to ECM (PCM), wire harness, etc.
(3) Turn ignition switch ON.
7) Apply battery voltage to injector for 15 seconds and measure in-
jected fuel volume with graduated cylinder.
Test each injector two or three times.
If not within specification, replace injector.
Injected fuel volume:
42 – 52 cc / 15 sec. (1.42 / 1.48 – 1.75 / 1.83 US / lmp. oz / 15 sec.)
for G16 engine.
55 – 62 cc / 15 sec. (1.94 / 2.09 – 2.18 / 2.36 US / lmp. oz / 15 sec.)
for J20 engine.
8) Check fuel leakage from injector nozzle. Do not operate injector
for this check (but fuel pump should be at work).
If fuel leaks more than following specifications, replace.
Fuel leakage: Less than 1 drop / min.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...