YH4
GRAND
VITARA
6E1-10
ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
INFORMATION SENSORS
-
1. MAF sensor
-
2. VSS
-
3. Heated oxygen sensor-1
3-1. Heated oxygen sensor-2 (if equipped)
-
4. Power steering pressure switch
-
5. ECT sensor
-
6. Battery
-
7. TP sensor
-
8. Transmission range switch (A / T only)
-
9. Camshaft position sensor (CMP sensor)
-
10. IAT sensor
-
11. CO adjusting resistor (if equipped)
-
12. Fuel level sensor
-
13. ABS control module (if equipped)
-
14. A / C control module (amplifier) (if equipped)
-
15. Blank
-
16. MAP sensor
-
17. Crankshaft position sensor (if equipped)
-
18. Ignition timing adjusting resistor (if equipped)
-
19. Monitor connector (if equipped)
CONTROLLED DEVICES
a : Fuel pump relay (Canvas top) /
:
Main relay (Hard top)
b : Injectors
c : EGR valve (if equipped)
d : Idle air control valve
e : Ignition coil assemblies
g : Malfunction indicator lamp
h : Main relay (Canvas top) /
:
Fuel pump relay (Hard top)
i : EVAP canister purge valve
j : A / C condenser fan motor relay
:
(if equipped)
OTHERS
A : PCM / ECM
B : EVAP canister
C : Data link connector
D : Combination meter
G16 ENGINE
NOTE:
Above figure shows left-hand steering vehicle.
For right-hand steering vehicle, parts with (*) are
installed at the other side.
The electronic control system consists of 1) various
sensors which detect the state of engine and driving
conditions, 2) ECM (PCM) which controls various de-
vices according to the signals from the sensors and
3) various controlled devices.
Functionally, it is divided into the following sub sys-
tems:
Fuel injection control system
Heated oxygen sensor heater control system
Idle air control system
Fuel pump control system
Evaporative emission control system
Ignition control system
EGR system
Also, with 4 A / T model, PCM controls A / T.
ELECTRONIC CONTROL SYSTEM
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...