YH4
GRAND
VITARA
1. Noise suppressor
4. Timing belt cover
5. Ignition label
2. Ignition timing
adjusting resistor
3. Character on
resistor
IGNITION SYSTEM (FOR G16 ENGINE)
6F1-7
7) If ignition timing is out of specification, check as follows.
For vehicle equipped with ignition timing adjusting resistor.
a) Check resistance of ignition timing adjusting resistor (if
equipped), referring to “Ignition Resistor” under “On-Vehicle
Service” later in this section.
b) If check result is not satisfactory, change ignition resistor with
consecutive character for the original one recheck that initial
ignition timing is within specification.
Select and check resistor with the next consecutive character
until specified ignition timing is obtained.
For example, if the vehicle being serviced has an ignition re-
sistor with an “5” mark, initial ignition timing can be changed
by replacing it with “4” or “N”.
Character on resistor (3)
1
2
3
4
Difference in advance degrees
as compared with those of “N”
– 5
_
– 4
_
– 3
_
– 2
_
5
N
6
7
8
9
10
11
– 1
_
0
_
1
_
2
_
3
_
4
_
5
_
6
_
NOTE:
If ignition resistor has been replaced, be sure to also re-
place ignition label attached to timing belt cover with the
one that has the same symbol as that marked on ignition
resistor.
For vehicle not equipped with ignition timing adjusting resistor.
Check the followings:
– CMP sensor and CKP sensor (if equipped)
– Signal rotor on camshaft
– TP sensor
– VSS
– Crankshaft pulley / timing belt cover installation
8) After checking, end fixed spark mode of SUZUKI scan tool or re-
move service wire from monitor connector.
CAUTION:
Driving with test switch terminal grounded will cause
damage to catalyst. Be sure to disconnect service wire
after adjustment.
NOTE:
In this state, ignition timing may vary more or less of initial
ignition timing but it is nothing abnormal.
9) With engine idling (closed throttle position and vehicle stopped),
check that ignition timing is about BTDC 6
_
– 10
_
. Also, check
that increasing engine speed advances ignition timing. If above
check results are not satisfactory, check input signals related to
ignition system.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...