YH4
GRAND
VITARA
1. ECM (PCM)
2. To ignition switch
3. Main fuse
4. Main relay
5. Monitor connector (if equipped)
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
6-41
TABLE A-1 MALFUNCTION INDICATOR LAMP CIRCUIT CHECK – MIL DOES NOT COME
“ON” OR DIMS AT IGNITION SWITCH ON (BUT ENGINE AT STOP)
WIRING DIAGRAM
CIRCUIT DESCRIPTION
When the ignition switch is turned ON, ECM causes the main relay to turn ON (close the contact point). Then, ECM
being supplied with the main power, turns ON the malfunction indicator lamp (MIL). When the engine starts to run
and no malfunction is detected in the system, MIL goes OFF but if a malfunction was or is detected, MIL remains
ON even when the engine is running.
INSPECTION
STEP
ACTION
YES
NO
1
MIL Power Supply Check:
1) Turn ignition switch ON.
Do other indicator/warning lights in
combination meter comes ON?
Go to Step 2.
“IG” fuse blown, main fuse
blown, Ignition switch
malfunction, “B / W” circuit
between “IG” fuse and
combination meter or poor
coupler connection at
combination meter.
2
ECM Power and Ground Circuit Check:
Does engine start?
Go to Step 3.
Go to TABLE A-5 ECM (PCM)
POWER AND GROUND
CIRCUIT CHECK.
If engine is not cranked, go to
DIAGNOSIS in Section 6G or
6G1.
3
MIL Circuit Check:
1) Turn ignition switch OFF and disconnect
connectors from ECM.
2) Check for proper connection to ECM at
terminal E61-34.
3) If OK, then using service wire, ground
terminal E61-34 in connector disconnected.
Does MIL turn on at ignition switch ON?
“W/R” circuit shorted
to ground or test
switch terminal of
monitor connector is
shorted to ground
(if equipped).
If OK, substitute a
known-good ECM
(PCM) and recheck.
Bulb burned out or “V / Y” wire
circuit open.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...