YH4
GRAND
VITARA
[60 A type]
[70 A and 85 A types]
HEATSINK TEMPERATURE (
_
C)
REGULA
TED VOL
T
AGE (V)
Volt
Temperature
6H-10
CHARGING SYSTEM
Higher Voltage
If voltage is higher than standard value, check ground of brushes.
If brushes are not grounded, replace IC regulator.
Lower Voltage
[60 A type]
If voltage is below or in standard value, increase engine speed up
to 2000 – 2500 rpm soon after starting engine, and read maximum
value on ammeter immediately.
If current is less than 42 A, repair or replace generator.
[70 A and 85 A types]
If voltage is lower than standard value, proceed to following check.
2) Ground F terminal and start engine, then measure voltage at B
terminal as shown in left figure.
_
Voltage is higher than standard value
It is considered that generator itself is good but IC regulator
has been damaged, replace IC regulator.
_
Voltage is lower than standard value
Generator itself has problem, check the generator.
Load Check [70 A and 85 A types only]
1) Run engine at 2,000 rpm and turn on head light and heater mo-
tor.
2) Measure current and if it is less than 20 A (70A type) or 30 A (85
A type) repair or replace generator.
OVERCHARGED BATTERY
1) To determine battery condition, refer to BATTERY section.
2) If obvious overcharge condition exists as evidenced by exces-
sive spewing of electrolyte, measure generator B terminal volt-
age at engine 2000 rpm.
3) If measured voltage is higher than upper limit value, proceed to
disassembly section of generator service.
4) Check ground of brushes. If brushes are not grounded, replace
IC regulator. Then check field coil for grounds and shorts, refer-
ring to “INSPECTION” section.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...