YH4
GRAND
VITARA
ENGINE (H25 ENGINE)
6-1-51
TROUBLESHOOTING
STEP
ACTION
YES
NO
1
Main Relay Operating Sound check:
Is operating sound of main relay heard at ignition switch
ON?
Go to Step 5.
Go to Step 2.
2
Fuse check:
Is fuse 8 in good condition?
Go to Step 3.
Check for short in
circuits connected
to this fuse.
3
Main Relay check:
1) Turn OFF ignition switch and remove main relay.
2) Check for proper connection to main relay at
terminal E07-2 and E07-4.
3) If OK, check main relay for resistance and operation
referring to “Main Relay Inspection” in section 6E2.
Is check result satisfactory?
Go to Step 4.
Replace main relay.
4
ECM (PCM) Power Circuit check:
1) Turn OFF ignition switch, disconnect connectors
from ECM (PCM) and install main relay.
2) Check for proper connection to ECM (PCM) at
terminals C51-2-3, 20, 21 and E61-8.
3) If OK, then measure voltage between terminal
C51-2-3 and ground, E61-8 and ground with
ignition switch ON.
Is each voltage 10 – 14 V?
Go to Step 5.
“B / W”, “Bl” or “B / R”
circuit open.
5
ECM Power Circuit check:
1) Using service wire, ground terminal E61-8 and
measure voltage between terminal C51-2-20
and ground at ignition switch ON.
Is it 10 – 14 V?
Check ground
circuits “B / G” and
“B / Bl” for open.
If OK, then substitute
a known-good ECM
(PCM) and recheck.
Go to Step 6.
6
Is operating sound of main relay heard in Step 1?
Go to Step 7.
“B / R” or “Bl” wire
open.
7
Main Relay check:
1) Check main relay according to procedure in Step 3.
Is main relay in good condition?
“B / R” or “Bl” wire
open.
Replace main relay.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...