YH4
GRAND
VITARA
ENGINE (H25 ENGINE)
6-1-89
DTC TROUBLESHOOTING
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
Ignition System inspection:
(1) Check spark plug and ignition spark of cylinder
where misfire occurs, referring to “IGNITION
SYSTEM” section.
Is it in good condition?
Go to Step 3.
Faulty ignition coil,
wire harness or spark
plug.
If OK, substitute a
known-good ECM
(PCM) and recheck.
3
Fuel Injector Circuit check:
(1) Check fuel injector circuit referring to “TABLE B-2”
in this section.
Is it in good condition?
Go to Step 4.
Repair or replace.
4
Fuel Injector Operation check:
(1) Using sound scope, check each injector operating
sound at engine cranking or idling.
Do all injectors make operating sound?
Go to Step 5.
Check injector not
making operating
sound.
If OK, substitute a
known-good ECM
(PCM) and recheck.
5
Fuel Pressure inspection:
(1) Check fuel pressure referring to “TABLE B-3” in this
section.
Is check result satisfactory?
Go to Step 6.
Repair or replace.
6
Fuel Injector inspection:
(1) Check fuel injector(s) referring to “ENGINE AND
EMISSION CONTROL SYSTEM” section.
Is check result satisfactory?
Go to Step 7.
Replace.
7
Ignition Timing inspection:
(1) Check ignition timing referring to “IGNITION
SYSTEM” section.
Is check result satisfactory?
Go to Step 8.
Adjust.
8
EGR System inspection:
(1) Check EGR system referring to “ENGINE AND
EMISSION CONTROL SYSTEM” section.
Is check result satisfactory?
Go to Step 9.
Repair or replace.
9
Fuel Level Sensor inspection:
(1) Check fuel level sensor referring to “ENGINE AND
EMISSION CONTROL SYSTEM” section.
Is check result satisfactory?
Go to Step 10.
Repair or replace.
10
Engine Mechanical Systems check:
(1) Check engine mechanical systems referring to
“ENGINE MECHANICAL” section.
Is check result satisfactory?
Substitute a known-
good ECM (PCM)
and recheck.
Repair or replace.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...