YH4
GRAND
VITARA
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
6-65
TROUBLESHOOTING (DTC P0141)
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
HO2S-2 Heater Check:
1) Disconnect HO2S-2 coupler with ignition
switch OFF.
2) Check resistance between “3” and “4” terminal of
HO2S-2 connector.
Is it within 11.7 – 14.3
(at 20
_
C, 68
_
F)?
Go to Step 3.
Replace HO2S-2.
3
HO2S-2 Power Supply Check:
1) Connect HO2S-2 connector.
2) Check voltage between E61-3 terminal of ECM
(PCM) connector and body ground with ignition
switch ON.
Is it 10 – 14 V?
Go to Step 4.
“B / W” or “P / G” circuit
open / shorted to
ground.
If wire and connec-
tions are OK, substi-
tute a known-good
ECM (PCM) and
recheck.
4
HO2S-2 Heater Operation Check:
1) Drive vehicle about 30 – 40 mph (50 – 60 km / h)
for 2 min. or more.
2) Stop vehicle and check voltage between E61-3
terminal of ECM (PCM) connector and body
ground with engine idling.
Is it 0 – 1 V?
Intermittent trouble.
Check intermittent
referring to “Intermit-
tent and Poor Connec-
tion” in Section 0A.
Poor E61-3 connec-
tion.
If connection is OK,
substitute a known-
good ECM (PCM)
and recheck.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...