YH4
GRAND
VITARA
6F2-6
IGNITION SYSTEM (FOR J20 / H25 ENGINES)
1. Injector coupler
J20 Engine
H25 Engine
1. DLC
1. Monitor coupler
2. Service wire
3. Ground terminal
4. Test switch terminal
IGNITION SPARK CHECK
1) For H25 engine, remove surge tank cover.
2) Disconnect injector coupler.
WARNING:
Without disconnection of injector coupler, combustible
gas may come out from spark plug holes during this test
and may get ignited in engine room.
3) Remove spark plug and check it for condition and type, referring
to “Spark Plug” under “On-Vehicle Service” later in this section.
4) If OK, connect ignition coil coupler to ignition coil assembly and
connect spark plug to ignition coil assembly. Ground spark plug.
5) Crank engine and check if each spark plug sparks.
If no spark is emitted, inspect the related parts as described un-
der “Diagnosis” earlier in this section.
6) After checking, install spark plug, referring to “Spark Plug” under
“On-Vehicle Service” later in this section.
7) Connect injector coupler.
8) For H25 engine, install surge tank cover.
IGNITION TIMING CHECK AND ADJUSTMENT
NOTE:
Before starting engine, place transmission gear shift lever in
“Neutral” (shift selector lever to “P” range for A / T model), and
set parking brake.
1) Start engine and warm it up to normal operating temperature.
2) Make sure that all of electrical loads except ignition are switched
off.
3) Check to be sure that idle speed is within specification.
Refer to SECTION 6E1 or 6E2.
4) [Using SUZUKI scan tool (Tech 1)]
Connect SUZUKI scan tool (Tech 1) to DLC (1) with ignition
switch OFF, restart engine and fix ignition timing by using fixed
spark mode of SUZUKI scan tool (Tech 1).
Special Tool
(A): 09931-76011 (SUZUKI scan tool)
(B): Mass storage cartridge
(C): 16/14 pin DLC (OBD-
II
adaptor) cable
[Not using SUZUKI scan tool (Tech 1)]
a) Remove monitor coupler cap.
b) Ground test switch terminal in monitor coupler by using ser-
vice wire so that ignition timing is fixed on initial one.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...