YH4
GRAND
VITARA
6-28
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
ENGINE BASIC CHECK
This check is very important for troubleshooting when ECM (PCM) has detected no DTC and no abnormality has
been found in visual inspection.
Follow the flow table carefully.
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
Check battery voltage.
Is it 11 V or more?
Go to Step 3.
Charge or replace
battery.
3
Is engine cranked?
Go to Step 4.
Go to “DIAGNOSIS”
in Section 6G or
6G1.
4
Does engine start?
Go to Step 5.
Go to Step 7.
5
Check engine idle speed / IAC duty referring to “Idle
speed / IAC Duty Inspection” in Section 6E1.
Is check result as specified?
Go to Step 6.
Go to “Engine
Diagnosis Table” in
this section.
6
Check ignition timing referring to “Ignition Timing
Inspection” in Section 6F1 or 6F2.
Is check result as specified?
Go to “Engine
Diagnosis Table” in
this section.
Adjust ignition
timing or check
input signals
related to
ignition system.
7
Is immobilizer control system equipped?
Go to Step 8.
Go to Step 9.
8
Check immobilizer system malfunction as follows.
1) Check immobilizer indicator lamp or MIL (malfunction
indicator lamp) for flashing.
Is it flashing when ignition switch is turned to ON
position?
Go to “DIAGNOSIS”
in Section 8G.
Go to Step 9.
9
Check fuel supply as follows:
1) Check to make sure that enough fuel is filled in fuel
tank.
2) Turn ON ignition switch for 3 seconds and then OFF.
Repeat this a few times.
Is fuel return pressure (returning sounds) felt from fuel
return hose when ignition switch is turned ON?
Go to Step 11.
Go to Step 10.
10
Check fuel pump for operating.
1) Was fuel pump operating sound heard from fuel filler
for about 3 seconds after ignition switch ON and stop?
Go to “Diag. Flow
Table B-3”.
Go to “Diag. Flow
Table B-1”.
11
Check ignition spark referring to “Ignition Spark Test”
in Section 6F1 or 6F2.
Is it in good condition?
Go to Step 12.
Go to “DIAGNOSIS”
in Section 6F1 or
6F2.
12
Check fuel injector referring to “Fuel Injector Inspection”
in Section 6E1.
Is it in good condition?
Go to “Engine
Diagnosis Table” in
this section.
Go to “Diag. Flow
Table B-2”.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...