YH4
GRAND
VITARA
1. Gaging plastic
1. Rod bearing cap
2. Arrow mark
3. Crankshaft pulley side
ENGINE MECHANICAL (G16 ENGINE)
6A1-59
Crank Pin and Connecting Rod Bearings
Inspect crank pin for uneven wear or damage. Measure crank pin
for out-of-round or taper with a micrometer. If crank pin is
damaged, or out-of-round or taper is out of limit, replace
crankshaft or regrind crank pin referring to following step 6).
Connecting rod
bearing size
Crank pin diameter
Standard
43.982 – 44.000 mm
(1.7316 – 1.7322 in.)
0.25 mm undersize
43.732 – 43.750 mm
(1.7218 – 1.7224 in.)
Out-of-round and taper limit: 0.01 mm (0.0004 in.)
Rod bearing:
Inspect bearing shells for signs of fusion, pitting, burn or flaking
and observe contact pattern. Bearing shells found in defective
condition must be replaced.
Two kinds of rod bearing are available; standard size bearing and
0.25 mm undersize bearing. To distinguish them, 0. 25 mm under-
size bearing has the stamped number (US025) on its backside as
indicated in figure, but standard size one has no number.
Rod bearing clearance:
1) Before checking bearing clearance, clean bearing and crank
pin.
2) Install bearing in connecting rod and bearing cap.
3) Place a piece of gaging plastic to full width of crankpin as con-
tacted by bearing (parallel to crankshaft), avoiding oil hole.
4) Install rod bearing cap to connecting rod.
When installing cap, be sure to point arrow mark on cap to
crankshaft pulley side, as shown in figure. After applying en-
gine oil to rod bolts, tighten cap nuts to specified torque. DO
NOT turn crankshaft with gaging plastic installed.
Tightening Torque
(a): 35 N
.
m (3.5 kg-m, 25.5 lb-ft)
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...