YH4
GRAND
VITARA
6E2-16
ENGINE AND EMISSION CONTROL SYSTEM (H25 ENGINE)
A: Output duty select
switch terminal
B: Diagnosis switch terminal
C: Blank
D: Ground terminal
E: Test switch terminal
F: Duty output terminal
[Not using SUZUKI scan tool] (vehicle with monitor connector)
NOTE:
If ECM (PCM) parts No. ends with “0”, ECM (PCM) does not out-
put IAC duty through duty output terminal in monitor coupler.
First of all, check label on ECM (PCM) for part No. if so, check
IAC duty by using Tech 1.
1) Disconnect scan tool from DLC if connected.
2) Warm up engine to normal operating temperature.
3) Stop engine and connect duty meter (3) between duty output ter-
minal and ground terminal of monitor connector (1).
4) Using service wire (2), ground diagnosis switch terminal in moni-
tor connector.
5) Set tachometer.
6) Start engine and warm it up completely.
7) Check IAC duty and idle speed. If duty and / or idle speed is out
of specifications, check idle air control system referring to Diag-
nostic Flow Table B-4 “IDLE AIR CONTROL SYSTEM CHECK”
in this section.
A / C OFF
A / C ON
Engine idle speed:
750
50 r / min.
800
50 r / min.
IAC duty at specified
idle speed:
10 – 50% (1.4 – 7.0 V
when battery
voltage is 14 V)
———
NOTE:
IAC duty can be checked roughly by using voltmeter. IAC
duty to voltage relation is as follows.
ON DUTY
METER INDICA-
TION (%)
OFF DUTY
METER INDICA-
TION (%)
VOLTMETER
INDICATION
(V)
0
50
100
100
50
0
0
0.5 x V
B
V
B
“OFF DUTY METER” is such duty meter that indicates
approx. 100% when terminal voltage is approx. “0 V”.
“V
B
” represents battery voltage while engine of vehicle
being checked is running.
8) Remove service wire from monitor connector.
9) Install cap to monitor connector.
10) Check that specified engine idle speed is obtained with A / C
ON if vehicle is equipped with A / C.
If not, check A / C ON signal circuit and idle air control system.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...