YH4
GRAND
VITARA
6-1-108
ENGINE (H25 ENGINE)
WARNING:
When performing a road test, select a place where there is no traffic or possibility of a traffic accident
and very careful during to avoid occurrence of an accident.
Road test, should be carried out with 2 person, a driver and tester, on a level road.
Intake air temperature: between – 14 C and 70 C (6.8 F and 158 F)
Atmospheric pressure: higher than 560 mmHg (Altitude: lower than 2790 m (9150 ft))
(1) With ignition switch OFF, connect scan tool.
(2) Turn ON ignition switch and clear DTC by using scan tool if any.
(3) Start engine and warm up to normal operating temperature.
(4) Increase vehicle speed till engine speed is reached 4000 r / min. in 3rd gear (M / T) or 2nd range (A / T).
(5) Release accelerator pedal and with engine brake applied, keep vehicle coasting and then stop vehicle.
(6) Check DTC by using scan tool.
DTC TROUBLESHOOTING
STEP
ACTION
YES
NO
1
Was “ENGINE DIAG. FLOW TABLE” performed?
Go to Step 2.
Go to “ENGINE
DIAG. FLOW
TABLE”.
2
Does speedometer indicate vehicle speed?
Faulty “Bl / Y” wire,
poor C51-3-1
connection or
intermittent trouble.
If OK, substitute a
known-good ECM
(PCM) and recheck.
Go to Step 3.
3
VSS Power Supply Voltage check:
(1) Remove ECM (PCM) cover.
(2) With ignition switch OFF, remove VSS coupler (1).
(3) With ignition switch ON leaving engine OFF, check
voltage between C20-3 and C20-2 terminal of VSS
coupler.
Is voltage 10 – 14 V?
Go to Step 4.
Faulty “B / Bl”,
“B / Y” wire.
4
VSS Signal Harness check:
(1) With ignition switch ON leaving engine OFF, check
voltage between C20-1 and C20-2 terminal of VSS
coupler.
Is voltage 4 V or more?
Go to Step 5.
Go to Step 6.
5
VSS Visual inspection:
(1) Remove VSS (2) referring to “TRANSFER” section.
(2) Check VSS drive gear (4) and driven gear (3) for
damage and excessive wear.
Are they in good condition?
Poor VSS
connection.
If OK, substitute a
known-good VSS
and recheck.
Replace VSS.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...