YH4
GRAND
VITARA
6-104
ENGINE DIAGNOSIS (G16 / J20 ENGINES)
STEP
ACTION
YES
NO
4
Was idle speed within specification in
Step 1?
Check for following:
– Vacuum leaks
– Air inhaling
– EVAP canister purge
control system
– Accessory engine load
– Stuck of PCV valve
– Clog of idle air passage
– MAF sensor
– TP sensor
– ECT sensor
– EGR valve malfunction
(leakage from valve seat)
– A/C signal
– Transmission range switch
signal
Go to Step 5.
5
Was idle speed higher than specification
in Step 1?
Go to Step 6.
Go to Step 9.
6
Check A / C (input) signal circuit referring to
Step 1 of Table B-5 A / C Signal Circuit
Check, if equipped. (A / C signal can be also
checked by using Tech-1.)
Is it in good condition?
Go to Step 7.
A / C signal circuit open
or short, or A / C system
malfunction.
7
Check ABS signal circuit for voltage
if equipped.
1) Turn ignition switch ON.
2) Check voltage between E61-30 terminal
of ECM (PCM) connector connected and
body ground.
Is voltage 10 – 14 V?
Go to step 8.
ABS signal circuit
shorted to ground
or ABS malfunction.
8
Was IAC duty less than about 2% in Step 1
of this table?
Check abnormal air inhaling
from intake manifold, throttle
body, PCV valve and EVAP
canister purge control system.
Check TP sensor
(closed throttle posi-
tion) and ECT sensor
for performance.
If sensors are OK,
substitute a known-
good ECM (PCM) and
recheck.
9
Check transmission range switch signal
referring to “Inspection of ECM (PCM)
and its Circuit” in this section.
Is check result satisfactory?
Go to Step 10.
Transmission range
switch malfunction or
its circuits open or
short.
10
Was IAC duty more than about 30% in
Step 1 of this table?
Check parts or system which
can cause engine low idle.
– Air inhaling from between
throttle body and MAF
sensor.
– EGR valve malfunction
(leakage from valve seat)
– Accessory engine load
– Clog of idle air passage
– Etc.
Substitute a known-
good ECM (PCM) and
recheck.
Содержание 2000 Grand Vitara SQ416
Страница 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Страница 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Страница 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Страница 205: ...6 1 94 ENGINE H25 ENGINE Fig for STEP 4 1 Disconnected CMP sensor coupler 2 BI B wire terminal 3 Gr Y wire terminal...
Страница 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Страница 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Страница 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Страница 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Страница 549: ...Or W Bl G Bl Y C51 1 22 C51 1 23 C51 1 10 C51 1 11 6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Страница 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Страница 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Страница 661: ...IGNITION SYSTEM FOR J20 H25 ENGINES 6F2 13 INSTALLATION For installation reverse removal procedure...
Страница 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...
Страница 729: ...Prepared by Overseas Service Department 1st Ed April 2000 Printed in Japan Printing April 2000 736...