
Installing HiPath 3000
P31003-H3560-S403-54-7620, 09/05
4-164
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
inst_h3.fm
Installing HiPath 3750, HiPath 3700
4.3.9
Performing a Visual Inspection
Introduction
Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The procedure is shown in Table 4-18. The visual inspection must be
performed while the system is disconnected from the power supply.
Visual Inspection Procedure
7
Caution
Before beginning work, make sure that the system is grounded and disconnected
from the power supply.
Observe the measures for protecting electrostatically sensitive devices (see Page 1-
9).
Table 4-18
Visual Inspection Procedure
Step
Activity
Resources/
Remarks
Action
1.
Compare the slots for the in-
stalled boards with the board
assignment map.
Board assignment
map
Correct the board config-
uration and notify the
sales department.
2.
Check all boards for proper
seating.
See Page 4-162
Check the additional
mechanical attach-
ments for the UPSM.
Reconnect and fasten the
boards.
3.
Check the local line voltage.
Digital multimeter
>
After finishing the visual inspection, you can begin starting up the HiPath 3750 or Hi-
Path 3700 system as described in Chapter 5.
Содержание HiPath 3000 V3.0 or later Gigaset M1 Professional
Страница 1: ...HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual ESHB 60 004 05 09 22 09 05 ...
Страница 1168: ...Figures P31003 H3560 S403 54 7620 09 05 W 12 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOF fm ...
Страница 1178: ...Tables P31003 H3560 S403 54 7620 09 05 X 10 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOT fm ...
Страница 1201: ......