
Boards for HiPath 3000
P31003-H3560-S403-54-7620, 09/05
3-160
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
boards.fm
Peripheral Boards
Options for supplying power to the base stations
Each base station must be connected to the SLC16N via the main distribution frame (MDFU or
MDFU-E).
Always route the U
P0/E
interfaces on the SLC16N via a splitting strip to ensure that surges due
to lightning will be arrested. To do so, insert the polarized surge protectors (supplied) in the
plugging locations on the splitting strip from above.
The following options are available for supplying power to the base stations:
●
Power supply via one U
P0/E
interface (Page 3-161)
●
Power supply via two U
P0/E
interfaces (Page 3-162)
●
Power supply via three U
P0/E
interfaces (Page 3-163), for BS3/3 only
If the power supplied by the UPSC-D (HiPath 3550) is insufficient, additional power can be sup-
plied by installing the external power supply EPSU2 (Page 3-163).
Signal propagation times differ due to the varying distances between the base stations, the sys-
tem, and the connection cables used (refer to the HiPath Cordless Office service manual). The
SLC16N board automatically balances these propagation times.
>
For information on connecting the base stations, refer to the HiPath Cordless Office
service manual.
Содержание HiPath 3000 V3.0 or later Gigaset M1 Professional
Страница 1: ...HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual ESHB 60 004 05 09 22 09 05 ...
Страница 1168: ...Figures P31003 H3560 S403 54 7620 09 05 W 12 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOF fm ...
Страница 1178: ...Tables P31003 H3560 S403 54 7620 09 05 X 10 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOT fm ...
Страница 1201: ......