
Installing HiPath 3000
P31003-H3560-S403-54-7620, 09/05
4-30
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
inst_h3.fm
Installing HiPath 3800
Note on possible ground loops
4.2.4.5
Checking the Grounding
Procedure
Perform the tests in the table below to ensure that the system is properly grounded before star-
tup.
>
To avoid ground loops from remotely operated devices (V.24 system peripherals),
the devices should be connected to the same low-voltage network (sub-distribution
board) if possible.
If the building floor plan does not permit this, you may need a line driver to isolate
the external devices in the event of a malfunction.
Step
Activity
Target
1.
Check the ohmic resistance of the ground connection to
the 19-inch cabinet:
Perform measurement between the PE (protective
earth) on a socket in the internal installation (at the sys-
tem’s installation site) and HiPath 3800.
Prerequisites:
●
No device in the 19-inch cabinet is connected to the
low-voltage network via the power cable.
●
The system’s separate grounding (basic cabinet, ex-
pansion cabinet, patch panel) and the grounding of
the 19-inch cabinet are connected.
< 10 ohms
2.
Check the ohmic resistance between the individual sys-
tem parts (basic cabinet, expansion cabinet, patch pan-
el).
Prerequisite:
HiPath 3800 is not yet connected to the low-voltage net-
work via the power cable.
< 1 ohm
Содержание HiPath 3000 V3.0 or later Gigaset M1 Professional
Страница 1: ...HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual ESHB 60 004 05 09 22 09 05 ...
Страница 1168: ...Figures P31003 H3560 S403 54 7620 09 05 W 12 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOF fm ...
Страница 1178: ...Tables P31003 H3560 S403 54 7620 09 05 X 10 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOT fm ...
Страница 1201: ......