Section 3-6 - Completing the setup
3-6-9 Complete power down (cont’d)
2.) Select
Shutdown
to do a complete power down of the unit.
The Back End Processor will first turn off the LOGIQ E9 activity and print the message “Please wait
- Shutdown in progress in the LCD display on the Operator Panel.
Next, it starts to shut down itself. The time to turn down the unit, including the Back End Processor,
may vary from 10 seconds up to approximately 1 minute.
The last thing that shuts down, is the light on the Operator Panel, indicating that you can continue
with the next step.
3.) Switch off the Mains Power Circuit Breaker, located on the rear of the unit. This will cut power
distribution within the unit.
Before returning a system to the customer, perform the functional checks. See:
Figure 3-21 System - Exit / Download menu
NOTICE
Be sure to wait with the next step until the system has finished its shut-down. Failing to do so, may
destroy data on the Hard Disk Drive, making the system fail later.
NOTICE
For optimum system operation, it is recommended that a full shutdown of the system is performed at
least once every 24-hour period. If you shut down the system at the end of the day, no other action is
needed.
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......